Desalination for Water Supply and Design-Build-Operate Contract

11
07 December 2017
ADB is developing a 24 MLD desalination plant for water supply provision in the Jaffna peninsula, Sri Lanka through a design-build-operate (DBO) contract. This is the first large-scale desalination plant for drinking water supply financed by ADB, and serves as a good case for DBO application to attract top leading players.  Both DBO and the desalination systems are the trend for future projects' procurement processes and water supply investments.
 
This one-day workshop will serve as a platform to share the experiences and the lessons learnt during the project development process. It will help participants learn more about the desalination technology, including how to prepare and where to get help for such projects and approaches. A knowledge product will be developed after the workshop.

 

Venue: 
Philippines
ADB Organizer: 
Water Sector Group,
Urban Sector Group
Event Coordinator: 
Topics: 
Water,
Urban Development
Program and Learning Materials: 
Date Session / Activity Presentation Material Speaker(s)
07 Dec 2017 Presentation Environmental Considerations in Desalination: Jaffna SWRO
Desalination entails a process that includes sea water abstraction, treatment, waste disposal, and construction of facilities needed for ...
Achyutha Rao Aleti
07 Dec 2017 Presentation Environmental Impacts: Installation of Seawater Desalination Plant at Thalayadi
Desalination projects have environmental impacts that need to be addressed at the onset. This presentation shares various mitigation measures...
Manori Fernando
07 Dec 2017 Presentation Social Impacts and mitigation process – Lessons from Jaffna Seawater Desalinization plant
Desalination projects do not only affect marine life, they also affect the communities surrounding the project site. They have various socio...
K. Jinapala
07 Dec 2017 Presentation Innovative Desalination Design: Location, Pre-treament, Intake and Outfall (Part I)
Desalination projects involve risks that must be addressed to ensure that their negative impacts are minimized. This presentation shares ...
Matthew Giesemann
07 Dec 2017 Presentation Innovative Desalination Design: Location, Pre-treament, Intake and Outfall (Part II)
Desalination projects involve risks that must be addressed to ensure that their negative impacts are minimized. This presentation shares ...
Matthew Giesemann
07 Dec 2017 Bidding Document Design, Build and Operate (DBO) of a 24 MLD Sea Water Reverse Osmosis (SWRO) Desalination Plant at Thalaiyadi, Jaffna District, Sri Lanka
Design, Build and Operate (DBO) of a 24 MLD Sea Water Reverse Osmosis (SWRO) Desalination Plant at Thalaiyadi, Jaffna District, Sri Lanka...